80% of your daily volume comes in after 12:00. The race to the 16:00 cut-off determines your service level and customer retention.
Between 14:00 and 16:00, 60% of daily volume must be processed. Manual sorting creates bottlenecks and missed deadlines.
Under time pressure, error rates rise from 1% to 3-5%. Every missorting means €20-30 in recovery costs.
Wave 1 orders mix with Wave 2 and 3. Without automatic sorting by wave ID, order confusion arises.
All pickers converge on the same output zone. Physical congestion slows down the entire process.
Same-day fulfilment is all about optimizing 12:00-16:00. Every minute counts.
Last orders for same-day received. WMS starts wave 3 planning.
Pickers start final wave. Production to sorting must hit 14:00.
MicroSorter processes 60% of daily volume. Automatic zone assignment prevents congestion.
Last packages on carrier. All orders correctly sorted and labeled.
A fulfilment center in Brabant increased their same-day success rate from 85% to 99% by eliminating the sorting bottleneck.
The MicroSorter automatically recognizes wave IDs and sorts to the correct output zone. No manual intervention, no wave mixing.
Scan product, system identifies wave and sorts to correct zone output.
Automatic load distribution across zones prevents bottlenecks.
Express orders automatically get priority in sorting sequence.

A fulfilment center serving 3 webshops eliminated cut-off stress completely after MicroSorter implementation.
Automatic wave ID recognition and zone assignment. Process 3 waves simultaneously without mixing.
From 85% to 99% cut-off compliance. No more missed deadlines, no more rush errors.
Handle 2x volume without proportional staffing increase. Holiday peaks, no problem.